How far apart can I place the TopBrewer, fridge and faucet?
This article covers how far apart you can place the TopBrewer machine, the fridge and the faucet, and the key dimensions to plan the cabinets around them.
We recommend placing the fridge and the machine next to each other. If your space needs a different layout, you can place the fridge elsewhere, as long as it stays within the reach of the faucet hoses.
Distance limits
Item | Limit | Note |
|---|---|---|
Faucet hose length | 125 cm (4 ft 1¼ in) | Measured from the base of the faucet to the tips of the hoses |
Usable reach from the faucet | About 100 cm (3 ft 3 in) | Maximum distance from the faucet to the fridge and the machine |
Do not extend the hoses. With longer hoses, coffee, milk and other ingredients would reach the cup out of sync.
Key planning dimensions
Item | Requirement |
|---|---|
Cabinet internal width | At least 560 mm per cabinet |
Cabinet internal depth | At least 575 mm |
Cabinet internal height | 760 mm recommended, at least 700 mm |
Faucet installation | At least 500 mm clearance |
Cabinet ventilation | At least 75 cm² total air inlet area |
Water outlet | ¾" connection with shutoff, at least 250 mm above the cabinet bottom |
Drain | A waste stack in the cabinet next to the installation |
Electricity | Depends on market and model. See the Electricity section of the guide. |
The figures come from the Scanomat Pre-Installation Planning Guide 6.1. The guide also shows the installation layouts, cut-outs, electricity and plumbing for each configuration.
Planning files and help for professionals
The Professionals section of the Scanomat website has the files and tools architects, designers and builders need:
3D and Revit files: download TopBrewer models from ProdLib for your design software. Select Get the 3D Files.
Product configurations: each configuration comes with pre-installation guides and 2D and 3D files in standard formats. Select View Product configurations.
Product Selector: find the configuration that fits your space, drink menu and users. Select Try the Scanomat Product Selector.
Pre-installation guides: planning, cut-out, electricity and plumbing guides with diagrams and video tutorials. Select Get the guides with diagrams and video tutorials.
Specification expert: arrange a call about your project. In the contact form, choose Contact as Professional (Architect, Designer, Builder, etc.).
Notes
Always check the latest version of the pre-installation guide before you plan cut-outs and installations.
For a layout that the guide does not cover, contact a Scanomat specification expert through the Professionals section.
